First, we would like to wish you a Happy New Year!

Our first install of 2024 took place in Potter’s Bar where we were asked to install x6 EVCs and x6 sets of infrastructure to allow for the future expansion of our client’s EVC network.

For this reason, we turned to the trusty combination of the Sevadis MaxiCharger x Fuuse to achieve a professional, reliable, and smart charging solution. This combination is one we’ve now used on multiple installs and we cannot fault it, the integration is seamless, and most importantly our clients love it, as do we.

We started by notifying the local DNO of our planned installation and the work involved which they agreed to, this is an essential part of the process as without their approval the project cannot go ahead. The first task was to run up to 200m’s of 6MM 3CORE Hi Tuff to the charger locations, this cable is run on a 50mm tray. We installed x2 Fusebox DBs which are dedicated to supplying the EVCs, these units are connected to an ALM meter to ensure that power generation and consumption are efficiently balanced. This protects the building from any electricity cut-outs and reduces the risk of any faults.

Finally, we installed x6 Sevadis MaxiCharger’s integrated with Fuuse EVCP Management software and x6 Wiska boxes ready for the future expansion of the system. Our infrastructure works mean that when the client is ready to expand their system at a later date all we have to do is fit and commission the additional chargers, and switch on their supply.

Our Solution

The MaxiCharger is a wall or pedestal mounted single outlet universal Type 2 EV charger. It is OCPP 1.6 compliant and has static load management built-in and dynamic load balancing options as well as PME fault detection incorporated on a single and a three-phase connection.

Utilizing the MaxiChargers OCPP compliance the system is powered by Fuuse. The Flexible Charge Point Management Software allows the client to manage, monitor, and monetize their system with ease. The software is packed with features developed for you to easily manage your business without having to incur any of the costs associated with developing a back-office, phone app, secure payment, and management platform.

Drivers initiate charging sessions by scanning a QR code located on the face of the MaxiCharger. Visible summary of charging costs, such as /kWh rate, connection, parking, and overstay fees before starting sessions. Credit or debit card details can be stored for ease of future sessions.

Fuuse is an intelligent back-office management system that provides installers and charge point operators with significant opportunities for the future of electrified transport.

As Fuuse-approved installers, we can help you save energy, reduce costs, and generate revenue through one fully configurable charge point management software.

We quoted for this project to take up to 1 week which included the first fix, second fix, and commissioning, thankfully the project was completed on time and within budget! It’s fair to say when it comes to EVCs we know what we’re doing. The engineers have done a great job on this install!

As government-approved installers, our customers can take advantage of the OZEV electric vehicle charge point and infrastructure grants.

The EV infrastructure grant gives you money off the cost of wider building and installation work that’s needed to install multiple charge point sockets. The work can be for sockets you want to install now and in the future with a minimum of 5 required. Subject to your eligibility, you can claim up to £500 per parking space enabled with supporting infrastructure.

The WCS is open to businesses, charities, and public sector organisations that meet the applicant and site eligibility criteria. The grant covers up to 75% of the total costs of the purchase and installation of EV charge points (inclusive of VAT), capped at a maximum of £350 per socket and/or up to 40 sockets across all sites per applicant – for instance, if you would like to install them in 40 sites, you will have 1 socket available per site

Unfortunately, the WCS scheme ends in March 2024 so if you’re looking for a charging solution for your business act now!

If you’re looking for an EV Charging Solution at your home or business, contact our specialist team at 0845 0268530 or email lewis@mmvcontracting.com to put your wheels in motion.